HOME
SERVICES
• Shotcrete
• Drilled Shafts
• Soil Nail Walls
• Micropiles
• Design Build
• Soldier Piles
• Shoring Systems
CASE STUDIES
TESTIMONIALS
NEWS
CAREERS
ABOUT TBH
CONTACT TBH
LINKS
«« Return
Winnifred Street Bridge
—
Ruston, WA
(2003)
Installed 24 tiebacks beneath the existing bridge utilizing Klemm drill rig supported by a trolley system and crane. Placed shotcrete for slope protection and for existing wall buttressing.
Click on an image to view a larger version.
Copyright © 2009 TBH & Associates, LLC. All Rights Reserved.